Comprehensive Guidelines for AS 2419.1:2021 Fire Hydrant Installations
I. Introduction to AS 2419.1:2021
Purpose and Objectives of the Standard
AS 2419.1:2021 is the foundational Australian Standard that delineates the minimum requirements for the design, installation, and commissioning of fire hydrant systems across Australia. Its overarching objective is to ensure the efficient extinguishment of fire within site boundaries and to minimise the potential for fire spread, both within a single building or between adjacent structures or sites.
The standard’s comprehensive nature extends to various environments, including buildings, structures, storage yards, marinas, associated moored vessels, wharves, and industrial plants.
Scope and Applicability
AS 2419.1:2021 is widely endorsed by fire authorities, such as Fire and Rescue NSW (FRNSW), for the design and installation of fire hydrant systems in new buildings or premises.
These specific exclusions include:
- Class 7b or 8 buildings with a total volume exceeding 108,000 cubic meters.
1 - Buildings that incorporate automatic racked storage systems.
1 - Buildings with an effective height greater than 135 meters.
1 - Buildings or associated areas that include any special hazards.
7
For any new building or premises falling outside this defined scope, a “performance solution” for the fire hydrant system is required.
Importance of Compliance
Compliance with AS 2419.1:2021 is not merely a regulatory formality; it is fundamental to ensuring the efficacy of fire protection measures and, by extension, the safety of occupants and property.
The standard’s explicit exclusions for very large or complex buildings, such as those exceeding 135 meters in effective height or large Class 7b/8 warehouses, illustrate a recognition that conventional, prescriptive standards may not adequately address the unique and potentially extreme fire hazards inherent in such structures or systems.
II. Key Updates and Revisions in AS 2419.1:2021
Comparison with AS 2419.1:2017 and Earlier Versions
AS 2419.1:2021 represents a significant update, superseding the 2017 version and earlier editions such as AS 2419.1-2005.
Improved Water Flow Requirements
The 2021 revision introduces stricter requirements for water flow rates and pressures.
Enhanced Accessibility and Signage Standards
A key focus of AS 2419.1:2021 is the emphasis on enhanced accessibility and clear, easily recognisable signage for fire hydrants.
Upgraded Materials and Components
The 2021 standard mandates the use of more durable and corrosion-resistant materials for fire hydrant construction.
Provisions for Bushfire-Prone Areas
Recognising the escalating threat posed by bushfires, AS 2419.1:2021 includes specific guidelines for fire hydrant installations in bushfire-prone regions.
Changes in Scope and High-Rise Building Requirements
As previously noted, the scope of the standard is now explicitly limited to buildings with an effective height not exceeding 135 meters, Class 7b or 8 buildings not exceeding 108,000 cubic meters, and those without automatic racked storage systems.
The emphasis on stricter water flow requirements, specific provisions for bushfire-prone areas, and considerations for urban density indicates that the standard is not merely reactive to past incidents but proactively adapts to broader societal and environmental challenges.
Furthermore, the enhanced accessibility standards, clear signage requirements, and revised booster placement rules are all meticulously designed to improve the speed and effectiveness of firefighter operations.
Table 1: Key Changes in AS 2419.1:2021 vs. AS 2419.1:2017
| Aspect | AS 2419.1:2017 (Previous) | AS 2419.1:2021 (Current) | Significance of Change | Relevant Snippets |
| Scope Limitation | Applied broadly to all buildings | Excludes buildings >135m effective height, Class 7b/8 >108,000 m³, automated racked storage systems, special hazards | Mandates performance solutions for complex/high-risk buildings, recognising limitations of prescriptive approach. | |
| Water Flow Requirements | Less stringent | Stricter requirements for flow rates and pressures | Ensures capacity to combat larger, more intense fires, adapting to increased fire risks (climate change, urban density). | |
| Accessibility & Signage | Less emphasis/detail | Enhanced standards for unobstructed access and clear, specific signage | Improves firefighter response time and system usability in emergencies. | |
| Materials & Components | Ambiguity in some areas | Mandates more durable, corrosion-resistant materials | Increases system longevity, reduces maintenance, enhances reliability in harsh environments. | |
| Booster System Requirements | “More than six external hydrants” for booster mandate | “More than two feed hydrants” for booster mandate | Updates criteria for booster necessity, potentially requiring boosters more frequently for coverage. | |
| Booster Placement | Less specific guidance | Preferred location within 20m of main pedestrian/vehicle access | Improves accessibility for fire brigade connections. | |
| High-Rise Buildings | Limited specific requirements | Introduces requirements based on internationally applied standards | Addresses unique challenges of high-rise firefighting. | |
| Pipework & Valves | Combined into one section | Divided into two separate sections | Improves readability and clarity for design and installation. | |
| Informative Appendices | Less detailed | Includes informative appendices (C, D, E) to clarify intent | Provides further guidance for performance solutions and complex scenarios. | |
| Bushfire-Prone Areas | Limited specific provisions | Includes specific guidelines for hydrant installations | Direct response to increasing bushfire threats. |
This comparative table offers a clear, at-a-glance overview of the most significant changes introduced in AS 2419.1:2021. For professionals and property owners, it immediately highlights areas where existing practices or older designs may no longer be compliant, prompting necessary re-evaluations or upgrades. As an educational resource, it streamlines the understanding of the standard’s evolution, while also explaining the rationale behind these changes, such as adaptation to climate change, increased urban density, and improved firefighter safety. This deeper understanding aids in proactive compliance and effective risk mitigation.
III. System Design Requirements
Water Supply: Flow Rates, Pressures, and Duration
A sufficient and reliable water supply is the cornerstone of any effective fire hydrant system, necessitating precise adherence to specified flow rates and durations.
While specific requirements can vary based on building type and area, a common minimum water flow rate and pressure for installed reticulated hydrant systems is 10 Litres per second (L/s) at a residual pressure of 200 kilopascals (kPa).
Booster System Requirements and Placement
The criteria for mandating a booster system have been updated in AS 2419.1:2021. A booster is now required when more than two feed hydrants are necessary to achieve adequate coverage, a notable change from the previous stipulation of “more than six external hydrants”.
The standard also provides revised guidance on the preferred placement of booster assemblies. The optimal location for a booster is now specified as being within 20 meters of the main pedestrian entrance or at the main vehicle access point on the property boundary.
Hydrant Types, Locations, and Coverage (Internal vs. External)
AS 2419.1:2021 categorises fire hydrants and prescribes the requisite pressure and flow rates for various building types and areas, ensuring tailored fire protection.
External Hydrants:
- In situations where internal hydrants are absent, external hydrants are designed to provide coverage for up to four levels above ground and one level below ground.
2 - Conversely, if internal hydrants are present, external hydrants can extend coverage to two levels above ground and one level below ground.
2 - An external fire hydrant is classified as an “attack fire hydrant” if it is located not more than 100 meters from a hardstand, provided it is located in accordance with Clause 3.5.3.3.
For attack hydrants situated between 50 meters and 100 meters from a hardstand, a critical requirement is that they must be in line of sight and provided with appropriate signage.20 20 - External feed hydrants must be strategically located not more than 20 meters from a fire brigade pumping appliance positioned on a hardstand.
20 - All parts of a building or open yard that are protected by an external feed hydrant must be no more than 70 meters from a fire brigade pumping appliance connected to that external feed hydrant.
20 - For building coverage, a maximum hose length of 60 meters from external attack hydrants or fire appliances is specified.
20
Internal Hydrants:
- All parts of a floor within a building shall be not more than 40 meters from an internal fire hydrant.
This distance can be extended to 45 meters where travel distances throughout the building comply with the Deemed-to-Satisfy provisions of the NCC.20 20 - Where additional fire hydrants are required in sprinkler-protected Class 2, 3, or 4 buildings, they must be located not more than 25 meters from an internal fire hydrant within a fire-isolated stair.
The existing maximum separating distance of 25 meters between internal hydrants, which ensures overlapping coverage, continues to apply to all building classifications.20 20 - A maximum hose length of 30 meters from internal hydrants is specified for building coverage, with a minimum of 1 meter of hose required to enter any room served.
2
Pipework and Valves: Materials and Specifications
The standard has restructured its approach to pipework and valves, dividing the previous Section 8 into two distinct sections.
Considerations for Performance Solutions (when outside standard scope)
For buildings that fall outside the prescriptive scope of AS 2419.1:2021—such as those with an effective height exceeding 135 meters, large Class 7b or 8 buildings, structures with automatic racked storage systems, or those with special hazards—a performance solution is a mandatory requirement.
The detailed requirements for water supply, booster systems, and hydrant placement and coverage are not isolated provisions; rather, they are deeply interconnected elements of a holistic fire safety strategy.
Table 2: System Design Requirements & Related Standards
| Design Element | AS 2419.1:2021 Requirement Summary | Related Standards/Codes | Key Considerations | Relevant Snippets |
| Water Supply | Sufficient flow rates and durations; assessment of pressure, flow capacity, and available sources. Validation of reticulation main capacity under 95th percentile demand. Minimum 4-hour duration. | AS 2419.2 (Water Supplies for Fire Hydrant Systems), AS 3500 (Plumbing and Drainage), Local Water Authority Regulations | Static pressure, residual pressure, flow rates at remote hydrants, hydraulic modeling, fire authority reports. | |
| Booster System | Mandated when >2 feed hydrants needed for coverage. Preferred location within 20m of main pedestrian/vehicle access. | NCC (National Construction Code), Local Fire Authority Guidelines (e.g., FRNSW) | Accessibility for fire brigade, protection of assembly, integration with overall fire strategy. | |
| Hydrant Types & Locations | Selection based on risk assessment and layout. Specific coverage distances for internal (40m/45m, 30m hose) and external (70m from appliance, 60m hose) hydrants. Overlapping coverage required. | NCC (E1.3 Fire Hydrants), AS 1670 (Fire Detection, Warning, Control and Intercom Systems), State/Territory Specific Guidelines (e.g., DFES/BEB) | Effective height, building class, fire compartment size, hardstand proximity, line of sight for attack hydrants. | |
| Pipework & Valves | Durable, corrosion-resistant materials. Separation of previous “Pipework and Valves” section into two distinct sections. | AS 1547 (Welding), AS/NZS 1253 (Plumbing and Drainage), Manufacturer’s Specifications | Material benefits (longevity, reduced maintenance), proper joining methods, pressure integrity. |
This table serves as a structured overview, breaking down complex design requirements into manageable components and facilitating a clearer understanding of the various facets of system design. By explicitly listing related standards and codes, it guides users to additional crucial documents, emphasising that AS 2419.1:2021 operates within a broader regulatory framework. The inclusion of “Key Considerations” provides actionable insights and highlights critical points that designers and installers must address beyond just the basic requirements, fostering a deeper understanding of compliance and serving as a high-level checklist for verifying that all major design elements have been addressed.
IV. Installation Procedures
Excavation and Bedding for Pipework
The proper installation of fire hydrant pipework begins with meticulous excavation and bedding procedures. It is essential to ensure adequate compaction and support for all pipes to protect them against potential damage from external forces.
Pipe Joining and Connection Methods
Following excavation and bedding, the joining of pipes and their connections must be executed with precision, utilising only approved methods. These methods typically include welding, mechanical connections, or other techniques specified by the standard and relevant industry codes.
Hydrant Assembly and Connection
The final assembly and connection of fire hydrants must strictly follow the manufacturer’s specifications. This includes ensuring proper torque settings for all fittings and the correct application of appropriate sealants.
While design dictates what is needed for a fire hydrant system, the installation phase determines how well that system will perform over its lifespan. The emphasis on proper excavation, compaction, bedding, and meticulous pipe joining and testing highlights that the physical integrity and longevity of the system are directly dependent on high-quality installation practices.
V. Commissioning and Testing
Flushing and Debris Removal
Prior to placing a fire hydrant system into operation, a thorough flushing procedure is mandatory. This process is designed to effectively remove any debris, foreign matter, or air pockets that may have accumulated within the pipework during installation.
Hydrostatic Testing
Hydrostatic testing is a critical procedure to verify the structural integrity and leak-free nature of the installed pipework. According to AS 2419.1:2021, the pipework must be hydrostatically tested to a pressure that is the greater of either 1700 kPa or 1.5 times the highest working pressure to which the system will be subjected.
Flow Rate and Pressure Testing
The flow rate and pressure testing is a paramount functional assessment that confirms the system’s ability to deliver the required water volume and pressure under simulated operational conditions. This test necessitates the simultaneous discharge of water from the required number of the most hydraulically disadvantaged hydrants within the system.
The standard stipulates the provision of dedicated test facilities for conducting these flow tests, including provisions for the safe disposal of test water to a suitable drain.
Documentation and Handover Requirements
Upon successful completion of all commissioning and testing procedures, comprehensive documentation is required. This includes, but is not limited to, as-built drawings that accurately reflect the installed system, detailed test reports verifying compliance with all performance criteria, and comprehensive maintenance manuals.
Commissioning and testing are not merely administrative steps; they represent the critical verification phase that ensures an installed fire hydrant system genuinely meets its design intent and is fully prepared for operational deployment in an emergency.
Table 3: Commissioning & Testing Procedures
| Requirement | Description | AS 2419.1:2021 Reference | Related Standards/Codes | Key Purpose / Outcome | Relevant Snippets |
| Flushing & Debris Removal | Removal of debris and air pockets from pipework before operation. | Implied within commissioning | AS 1851 (Routine service of fire protection systems and equipment) | Ensures unobstructed flow and prevents damage to components. | |
| Hydrostatic Test | Pipework tested to greater of 1700 kPa or 1.5x highest working pressure for ≥2 hours. | Explicitly required | – | Confirms pipework integrity, leak-free joints, and structural soundness. | |
| Flow Rate & Pressure Test | Simultaneous discharge of most hydraulically disadvantaged hydrants at required outlet pressure/flow. Results adjusted to design pressure conditions. Test facility provision required. | Explicitly required | AS 1851 | Verifies system performance meets minimum total flow rate and pressure requirements under operational conditions. | |
| Booster Performance Test | System boosted to achieve additional 300kPa at hydrant outlet while maintaining flow; pump discharge pressure must not exceed design operating pressure. | Explicitly required | – | Confirms booster functionality and system’s ability to handle fire brigade boosting. | |
| Documentation & Handover | Provision of as-built drawings, test reports, maintenance manuals, and proper handover to owner/operator. | Explicitly required | – | Ensures clear record of system design, performance, and future maintenance needs. |
This table provides a clear, procedural outline of the critical tests required during commissioning, offering a straightforward roadmap for commissioning professionals and building certifiers. By detailing specific parameters, such as the 1700 kPa pressure and 2-hour duration for hydrostatic tests, it establishes concrete benchmarks for compliance verification. Understanding these tests is crucial for identifying potential weaknesses or failures in the system early, thereby mitigating operational risks during a real fire emergency. Furthermore, the explicit inclusion of documentation and handover requirements underscores the importance of robust record-keeping, which is vital for ongoing maintenance and regulatory audits, ensuring accountability throughout the system’s lifecycle.
VI. Ongoing Maintenance and Routine Servicing (Referencing AS 1851)
Importance of Regular Inspections and Checks
Compliance with AS 2419.1:2021 extends far beyond the initial design and installation phases; it necessitates continuous adherence to a web of interconnected regulations and guidelines, particularly concerning ongoing maintenance.
Operational and Pressure Testing
Regular operational checks and pressure testing of valves and hydrants are mandated to ensure adequate flow rates and overall functionality.
Addressing Defects (Critical vs. Non-Critical)
AS 1851 provides clear definitions for various types of defects and mandates their rectification. “Critical defects” are those that could render essential safety provisions (ESPs) inoperative, posing a high risk to occupants and fire authorities.
Signage Maintenance
The upkeep of signage and identification elements is a vital aspect of ongoing maintenance. All supplementary signage, beyond the basic requirements, must be permanently affixed, fade and weather resistant, and feature contrasting uppercase lettering consistent with AS 2419.1:2021.
The reliance on AS 1851 for ongoing maintenance signifies that a fire hydrant system’s “compliance” is not a one-time achievement at design and installation, but rather a continuous state. The concept of “baseline data” for verifying routine service activities further reinforces this, indicating that maintenance is fundamentally about sustaining the original performance level of the system.
Moreover, AS 1851 is referenced as the required maintenance standard within various “Emergencies Acts,” meaning that maintenance requirements are not merely industry best practices but are legally enforceable.
Table 4: Essential Signage Requirements
| Signage Type | Requirement/Content | Minimum Height | Location/Purpose | Relevant Snippets |
| General Compliance | Complies with, or is commensurate to, section 11.3 of AS 2419.1:2021. Permanently affixed, fade and weather resistant, contrasting uppercase lettering. | Not specified for general | Standardised information for firefighters. | |
| Additional Internal Fire Hydrant | Location plan (Section 11.6 AS 2419.1:2021) oriented to reader’s aspect, brief description of relative location. | Not less than 15 mm high | Adjacent to the fire hydrant valve, informs firefighters of additional internal hydrants for coverage. | |
| Attack Fire Hydrant (within 5m of Booster) | ‘ATTACK FIRE HYDRANT’ | Not less than 25 mm high | Within 5m of a fire brigade booster assembly (cabinet, enclosure, or recess). Assists firefighters identify the attack hydrant. | |
| Dry Fire Hydrant System Booster Connection | ‘DRY FIRE HYDRANT’ and ‘FILL SYSTEM BEFORE BOOSTING TO WORKING PRESSURE BEFORE USING’. If fed by street hydrant: ‘STREET HYDRANT’, ‘HP’ or ‘HR’, arrows, distance. | Not less than 25 mm high | At fire brigade booster connection for dry systems. Informs firefighters system is dry and needs filling. | |
| Dry Fire Hydrant Valve Outlet | ‘DRY FIRE HYDRANT’ and ‘BOOST SYSTEM BEFORE USING’ | Not less than 25 mm high | At internal fire hydrant valve outlet on dry systems. Informs firefighters internal hydrant is dry and needs boosting. | |
| Extended Coverage (External Attack Hydrant) | (a) ‘ATTACK FIRE HYDRANT’ (b) ‘ADDITIONAL HOSE LENGTHS MAY BE REQUIRED’ | (a) Not less than 25 mm high (b) Not less than 15 mm high | For external attack hydrants providing extended coverage. Informs firefighters that more hose may be needed. | |
| Extended Coverage (Internal Hydrant) | ‘ADDITIONAL HOSE LENGTHS MAY BE REQUIRED’ | Not less than 15 mm high | For internal hydrants providing extended hose coverage. Informs firefighters that more hose may be needed. | |
| Small-Bore Suction Outlets | Informs use by NSW Rural Fire Service appliances. | Not specified | For small-bore suction outlets (Section 5.3.1.3 AS 2419.1:2021). | |
| Miscellaneous Signage | Concise and unambiguous supplementary information for safe and effective operation of non-standard systems/components. | Consistent with AS 2419.1:2021 | When specific information is required for firefighters. Consultation with FRNSW recommended. |
This table is indispensable for ensuring firefighter safety and operational efficiency. Signage acts as the direct communication link between the installed system and the firefighters who must operate it under stressful emergency conditions. Clear and standardised signs reduce confusion, save critical time, and prevent errors during an emergency. The table provides specific content and size requirements for various signs, serving as a direct checklist for installers and certifiers to ensure regulatory compliance. By detailing what each sign conveys (e.g., “DRY FIRE HYDRANT,” “ADDITIONAL HOSE LENGTHS MAY BE REQUIRED”), it helps building owners understand the operational implications for emergency services, fostering a more informed approach to fire safety. Ultimately, proper signage is a crucial, yet sometimes overlooked, preventative measure that can avert missteps that might otherwise escalate a fire incident.
VII. Related Standards, Codes, and Regulations
National Construction Code (NCC)
AS 2419.1:2021 holds a pivotal position as a primary referenced document within the National Construction Code (NCC) 2022.
AS 1851 (Routine Service of Fire Protection Systems and Equipment)
AS 1851 is the fundamental standard governing the ongoing maintenance and routine servicing of fire protection systems, including fire hydrant systems.
Other Relevant Australian Standards
Compliance with AS 2419.1:2021 often necessitates adherence to a broader network of interconnected Australian Standards and Codes. These include:
- AS 2419.2 (Water Supplies for Fire Hydrant Systems): Directly referenced for ensuring sufficient water supply to meet specified flow rates and durations.
3 - AS 3500 (Plumbing and Drainage): Relevant for aspects of pipe joining and the overall assessment of water supply systems.
3 - AS 1319 (Safety Signs for the Occupational Environment): Provides guidelines for clear and visible signage, which is crucial for firefighter orientation and system operation.
10 - AS 3786 (Earthworks) and AS 2870 (Residential Slabs and Footings): Pertain to the critical aspects of proper excavation, compaction, and bedding for pipework, ensuring long-term stability and protection.
3 - AS 1547 (Welding) and AS/NZS 1253 (Plumbing and Drainage): Essential for specifying approved pipe joining and connection methods, ensuring the integrity and leak-free nature of the system.
3 - AS 1670 (Fire detection, warning, control and intercom systems): Referenced for considerations related to hydrant types and locations, often based on comprehensive risk assessments.
3
This comprehensive framework of interconnected standards ensures a holistic approach to fire safety, addressing various technical and operational aspects of fire hydrant installations.
State-Specific Regulations (e.g., NSW Fire and Rescue NSW positions)
Beyond the national standards, state and territory fire authorities play a crucial role in interpreting and supplementing AS 2419.1:2021 through their own position statements and guidelines. For instance, Fire and Rescue NSW (FRNSW) formally endorses AS 2419.1:2021 for new installations and provides specific requirements for supplementary signage that extend beyond the standard’s direct stipulations.
Compliance with AS 2419.1:2021 is not a singular task but a multi-layered process involving the National Construction Code, a suite of other Australian Standards, and specific state-based regulations.
VIII. Conclusion and Best Practices
Ensuring Long-Term Effectiveness and Safety
Compliance with AS 2419.1:2021 represents a comprehensive and ongoing commitment that spans meticulous design, precise installation, rigorous commissioning, and diligent, routine maintenance. The 2021 revision significantly enhances fire safety by addressing modern fire risks, improving operational efficiency for firefighters, and mandating the use of more durable and resilient system components.
While initial compliance costs might be perceived as significant, the benefits outlined in the standard, such as “reduced maintenance costs” due to upgraded materials and the invaluable “peace of mind” derived from enhanced fire safety, underscore the economic value of proactive adherence.
Best Practices
To ensure optimal compliance, effectiveness, and longevity of fire hydrant installations under AS 2419.1:2021, the following best practices are recommended:
- Engage Qualified Professionals: Always utilise hydraulic engineers, fire safety engineers, and licensed installers who possess proven experience and a deep understanding of AS 2419.1:2021 and its related standards.
- Adopt a Holistic Design Approach: Consider the entire fire hydrant system as an integrated unit, from the water supply source to the furthest hydrant outlet. This includes accounting for water pressure, flow rates, booster requirements, hydrant placement, and firefighter access in a comprehensive manner.
- Prioritise Rigorous Testing and Commissioning: Do not compromise on the thoroughness of commissioning and testing procedures. These are critical verification steps that confirm the system’s operational readiness and adherence to performance specifications.
- Implement Proactive Maintenance: Establish and strictly adhere to a robust maintenance schedule in accordance with AS 1851. Promptly addressing any identified critical or non-critical defects is essential to maintain system integrity and performance.
- Stay Updated with Regulatory Changes: Regularly review updates to AS 2419.1, the National Construction Code, and any state-specific fire authority guidelines or position statements. The regulatory landscape is dynamic, and continuous monitoring is vital for sustained compliance.
- Consult Fire Authorities Early: For complex projects or those falling outside the prescriptive scope of AS 2419.1:2021, engage with relevant fire authorities (e.g., FRNSW) during the initial design and development phase. This early consultation is crucial for developing approved performance solutions and ensuring alignment with operational requirements.
By embracing these guidelines and best practices, stakeholders can ensure that fire hydrant installations provide the highest level of protection, contributing significantly to the safety and resilience of buildings and premises across Australia.
Other References
- Fire and Rescue NSW Position Statements:
- Fire Hydrant System in New Building or Premises:
https://www.fire.nsw.gov.au/gallery/files/pdf/bfs/Position%20statement%20summary%20-%20Fire%20hydrant%20system%20in%20new%20building%20or%20premises.pdf - Fire Hydrant System Signage:
https://www.fire.nsw.gov.au/gallery/files/pdf/bfs/Position%20statement%20summary%20-%20Fire%20hydrant%20system%20signage.pdf
- Fire Hydrant System in New Building or Premises:
- Standards Australia:
- AS 2419.1:2021 Product Page:
https://store.accuristech.com/standards/as-2419-1-2021?product_id=2232851 - Standards Australia Catalogue:
https://www.standards.org.au/standards-catalogue/standard-details?designation=as-2419-1-2021 - NCC 2022 Standards Spotlight: Fire Hydrant Installations:
https://www.standards.org.au/blog/ncc-2022-standards-spotlight-fire-hydrant-installations
- AS 2419.1:2021 Product Page:
- Industry Overviews & Guides:
- Cybil Consults – Hydrant System Overview:
https://cybilconsults.com.au/hydrant-system-overview/ - Complete Pumps and Fire Protection – AS 2419.1-2021 Overview:
https://completepumpsandfire.com.au/as-2419-1-2021-fire-hydrant-installations-system-design-installation-and-commissioning/ - Complete Fire Group – Navigating AS 2419.1:
https://completefiregroup.com.au/navigating-as-2419-1-a-guide-to-australias-fire-hydrant-standards/ - Complete Fire Group – AS 2419.1-2017 vs. AS 2419.1-2021:
https://completepumpsandfire.com.au/navigating-the-changes-a-guide-to-as-2419-1-2017-vs-as-2419-1-2021/
- Cybil Consults – Hydrant System Overview:
- Regulatory & Compliance Documents:
- NSW RFS – Planning for Bush Fire Protection:(https://www.rfs.nsw.gov.au/__data/assets/pdf_file/0006/241584/Planning-For-Bush-Fire-Protection.pdf)
- Victorian Building Authority – Fire Hydrant Systems Testing:(https://www.vba.vic.gov.au/__data/assets/pdf_file/0017/168101/building_ESM_05_Fire-hydrant-system-testing_superseded-July2023.pdf)
- ACT Emergency Services Agency – Maintenance of Fire Protection Systems:(https://www.esa.act.gov.au/sites/default/files/2023-09/FSG-05%20Maintenance%20of%20Fire%20Protection%20Systems.pdf)
- SA Department for Infrastructure and Transport – MBS 002:(https://dit.sa.gov.au/__data/assets/pdf_file/0006/845745/MBS-002-Maintaining-the-performance-of-essential-safety-provisions-Version-2.pdf)
- BEB Info Note – Variations to AS 2419.1 2021:(https://cdn.prod.website-files.com/61de5d84c5a92d75c52a9ca6/6834092357714123c2935408_BEB%20Info%20Note%20-%20Variations%20to%20AS%2419.1%202021%20Fire%20Hydrant%20Installations.pdf)
- Other:
- Scribd – 2419-1-2021:
https://www.scribd.com/document/703029907/2419-1-2021 - Fire Protection Association Australia – AS 2419.1:2021 now published:(
)https://www.fpaa.com.au/Web/Web/Content/News/2021/September/AS_2419.1_2021_now_published.aspx - Mirage News – AS 2419.1:2021 Clause 4.2.7.1.2 Fire Hydrant Guide:
https://www.miragenews.com/as-2419-12021-clause-4-27-12-fire-hydrant-guide-1381967/ - Queensland Fire and Emergency Services – Fire Hydrant and Vehicle Access Guidelines:(https://www.fire.qld.gov.au/sites/default/files/2021-04/BFS-FireHydrant.pdf)
- Queensland Fire and Emergency Services – Fire Safety Systems in Marinas:(https://www.fire.qld.gov.au/sites/default/files/2021-05/FireSafetySystemsinMarinas.pdf)
- Boosterflow Testing – Fire Hydrant Requirements in NSW:(https://boosterflowtesting.com.au/fire-hydrant-requirements-in-nsw/#:~:text=According%20to%20AS%202419%2C%20fire,building’s%20occupants%20in%20an%20emergency.)
- Fire Safety Practitioners – Fire Hydrant Systems:
https://www.firesafetypractitioners.com.au/fire-protection-technology/fire-hydrant-systems/ - Gilgandra NSW Council – Marline Hydraulic Services Specification:
https://www.gilgandra.nsw.gov.au/files/assets/public/your-council/tenders-amp-quotes/q19_22/marline-hydraulic-services-specification-rev-5.pdf - Griffith University – Design Guidelines:(
)https://www.griffith.edu.au/__data/assets/pdf_file/0022/2032681/Design-Guidelines-Version-24-Changes-Highlighted.pdf - NFPA – Fire Hydrant Flow:
https://www.nfpa.org/news-blogs-and-articles/blogs/2024/01/12/fire-hydrant-flow - Town of Flower Mound – Fire Hydrant Location & Access:(
)https://www.flowermound.gov/DocumentCenter/View/37640
- Scribd – 2419-1-2021: